I remember the good old days when snake ass Google pretended to care by making all their data centers powered by renewables because it was cheaper to build a hydrodam for the datacenter than to take power from the existing grid.
Then AI “hyperscaling” rolled in which is literally just a fancy term for “how fast can we build each data center by cutting as many corners as possible”.
Water consumption by data center should be a rounding error and yet here we are in 2026 where data centers are using fresh water like a broken fire hydrant and running on legacy coal power.
Coal.
in 2026.
Even the dumbest of SimCity players could have done better than this.
bold of the authors to assume anthropic will consume any power in 2028 tbh
Kinda crazy to think it won’t considering every fuckin programmer on earth now uses Claude to do their job? Anthropic will go out of business after Microsoft does lol
Anthropic will be stripped for assets by MS/Amazon/Google
That’s only because it’s subsidized
Not only is all consumer usage subsidised but a huge amount of usage is from third party services and start ups are being given even larger subsidies or even free token allocation to make token usage go brrrr
As an industry it’s not like we’re going to have a 30-50% bump it’s that a bunch of current uses are just going to become completely unviable.
Apparently Opus 5.5 is 40% cheaper to run than their earlier model token wise, and runs faster.
Im not saying that’s enough of a change to make them sustainable, but if they can keep improvements like that up, it could make the difference needed.
We can only hope. The best outcome might be for the first crop of AI companies to go extinct, and for their successors to be running modest models with lower power demands and a business model beyond “make sure someone else is holding the bag when we tank.” And/or for AI to become something people run locally as just another tool for specific purposes, once all the circular financing blows up and companies remember they can sell RAM and storage to regular people.
AMD bought a company that developed a process to etch a model into the silicon chips, and can go model to chip in a few months. They did it with a 3b model and got 15k token/s at a fraction of the power needs.
If they can scale that up to a big enough model, it could be a really interesting change. Like a creative writing model doesnt need to be constantly updated the same as a programming model as programming languages evolve etc.
Could really help with cost and power issues.
all of that is happening. although the dram cartel will have to be dragged kicking, but they will be, the massive amount of datacentre stuff pouring onto ebay won’t let them keep prices high.
There have been past occasions where companies preferred to destroy their stock rather than allow them to flood onto the used market and bring retail prices down. If we’re lucky, data centre hardware will arrive on eBay etc., but if we’re unlucky and the logic of late-stage capitalism wins, it will be shredded and thrown into landfill.
i think by that point it won’t be their choice. ai companies are drowning in debt and commitments, and they used those very servers as collateral. it would be the lenders taking them back and selling them to recover what they can, and they won’t care that nvidia or micron would rather not compete with those chips.
Does anyone know how specialized this hardware actually is? Like are these chips, these cards, these facilities, just how much of this is repurposeable? I’m wondering what happens to all these AI datacenters, at both the facility and hardware level, as the bubble busts.
How specialized are these facilities? Could you convert one of those datacenters to a more socially responsible purpose? I don’t know how specialized the hardware is. Is it capable of running anything other than the kinds of things they’re doing? Could you say, repurpose a hyperscale datacenter to run some kickass physics simulations? (Though, the power bills alone! It’s not like there is some vast pool of unspent physics funding sitting around somewhere, just waiting to pay for a massive data center’s power bill, maintenance, and operation. If you donated a hyperscale datacenter to the physics department of a nearby R1 research university (or even to the university as a whole, could the university get enough use out of it to justify the ongoing costs?)
That’s what I really don’t know about these datacenters. Some of them? Straight to the scrap heap. The ones that simply have no reasonable path towards being powered by something other than on-site gas turbines and other such horrible options? Straight to the scrap heap. But those that are or can be powered in some responsible manner? I wonder to what degree the facilities can be repurposed in their entirety. Maybe not worth building them in the first place, but if you’ve already built the damn thing…
If the facilities cannot be repurposed, what about the hardware? Even if cards cannot be reused in other markets, can the cards be disassembled, and chips repurposed in other forms? How specialized is this hardware at the chip level?
But as far as I know, the hardware in these datacenters is not something compatible with a desktop computer form factor. You’re not going to get some god-tier graphics card for cheap by cramming some AI data center card into your desktop computer and controlling it via some triumph of homebrew engineering. Now, maybe if you’re really into running local AI models, I suppose that makes sense. I’m imagining something the size of a server rack, assumedly located in your garage or closet space. But even then, isn’t all this stuff built to work with proprietary liquid cooling systems? I just don’t know how practical it is for anyone to directly reuse this hardware in a consumer environment. Whenever you start ordering that shear amount of silicon, and planning facilities that large, you tend to really start making very specific hardware requests. I could be wrong, but I don’t believe much of this hardware can reasonably be reused, even by serious home lab enthusiasts.
You could repurpose a datacentre by removing the outside walls and everything inside them, then planting some vegetables.
A lot of the memory modules could be salvaged, both RAM and disk storage like SSDs may be reuseable. The chips are geared towards AI though, so wouldn’t be much use to consumers . They could be used for other server based tasks at reduced efficiency.
The hardware has been heavily specialized for AI tasks, but its not only AI. So while it won’t fit in a regular home PC, it could maybe run a streaming gaming service, but you’d only be using some fraction of the value of what the hardware could do. But if they went bankrupt and someone got it cheap, that might make it work cost effectively.
Same idea with many options.
Probably a lot of non LLM AI uses as well, like analyzing images via machine learning.

The fake intelligence is taking our jobs away
eh, not really. layoffs are roughly on par with historical %'s they’re just using AI as the excuse
No, I meant the lack of openings for freshers. Also, startups are most definitely replacing employees with AI.
I thought almost 100% of their power came from hype and fear-mongering?
You might have confused power with money.
This will go over well in the winter.
Isn’t the future amazing!
Yes, it isn’t.
The headline assumes AI adoption is going to got according to Anthropics own forecast. If you believe the AI companies hype about growth, then I think you should believe we’re about to have ‘AGI’ takeover the world, and you should have bigger concerns.
If you believe the bubble is about to pop, then conversely we’re about to see all these new gas power plants and datacenters go ~unused, and we’ve just seen a pretty big renewable buildout…
How much of that gas will be relatively efficient gas power plants with reasonable exhaust cleaning and how much of it will be gas turbines that are incredibly inefficient and dirty?
Huge bubble. First it was talking about data centers in orbit, now it’s the gross reality of gas turbines powering data centers. Either way, it’s not going to last much longer with the market crash.
¯\(ツ)/¯
Luckily, Anthropic is not the only option.
Aren’t they all using large amounts of fossil fuels? Is there anyone running LLMs on renewables, other than users with local models at home?
Some countries use more renewables than others. Some data centers are installed in those countries.








